01.SH 130 at SH 45 Looking East 06.01.06
02.Beam Placement CR 118 06.05.06
03.MSE Wall Chandler Rd Bridge 06.14.06
04.Concrete deck placement I-35 DC 06.15.06
05.RTP at US 29 06.16.06
06.Beam Placment 290 DC 07.25.06
07.Beam Placement Chandler 07.31.06
08.Tunnel Const MLP7 08.04.06
09. MLP5 08.07.06
10.MLP6 08.07.06
11.deck placement 130.45 interchange 08.14.06
12.SH 130 at Colorado River 08.15.06
13.150' beam placement Colorado River 08.21.06
14.RTP Construction S of FM 969 09.07.06
15.Paving Operations near Bloor Road 09.11.06
16.Seg 3 MLP const 09.22.06
17.Beam Placement Decker Creek 10.12.06
18.Concrete Deck Placement US 290 DC 10.23.06
19.Concrete Deck Placement Blue Bluff 11.02.06
20.Concrete Paving near Bloor Rd 11.08.06
21.RTP Const near Bloor Road 11.08.06
22.Setting Pre-Cast Beams Elm Creek Bridge 11.08.06
23.MLP8 Const 11.17.06
24.Precast Beams Set over CM RR 11.17.06
25.SH 130 at SH 71 12.01.06
26.Concrete paving N of Harold Green 12.15.06
27.Placement Steel Girders SH 71 DC 01.27.07